Trans-Alaska Pipeline

Photo by Luca Galuzzi, Wikimedia Commons (CC BY-SA 2.5)

Trans-Alaska Pipeline

An 800-mile oil artery crossing tundra, mountains, and permafrost/Infrastructure

The Trans-Alaska Pipeline System (TAPS) stretches 1,288 kilometers from Prudhoe Bay on the Arctic coast to the port of Valdez on Prince William Sound. Completed in 1977 at a cost of roughly $8 billion (about $40 billion adjusted for inflation), the pipeline was one of the largest private construction projects in history. It crosses three mountain ranges, over 800 rivers and streams, and vast stretches of permafrost. About half of the pipeline is elevated on vertical support members with heat pipes to prevent the warm oil from melting the permafrost beneath. The pipe itself has an outer diameter of 1.22 meters (48 inches). At peak capacity, it moved roughly 2 million barrels per day, though throughput has declined significantly since the 1980s.

Measurements

Total length1.3 million m
17.4 millionBaseball diameters
5.9 millionTV remotes
42,933Blue whale lengths
Pipe outer diameter1.22 m
1.3 tenthsRV lengths
4.1 tenthsDiving boards
Pipe wall thickness1.3 hundredths m
2.6 tenthsDominoes
57.7 millionSilicon atoms
Elevated section length676,000 m
52 millionSugar cubes
9.3 millionLipstick tubes
Highest elevation (Atigun Pass)1,444 m
5,157Paper towel sheets
3.2 thousandthsGrand Canyon lengths
131London double-decker buses
Construction duration94.6 million s
9.78School semesters
3.2 millionElevator ride durations

About 3 years, 1974 to 1977

Browse more in Infrastructure